ITEM:    MAKING PROJECTING/FLAG MOUNTS

DESCRIPTION: Choices in projecting and flag mounts are also covered in 4409III, 4409KKK the Sign One system allows a wide variety of applications.

CONSTRUCTION: All options use Sign One components and/or standard aluminium extrusion.

SPECIFICATION:
STEP 1: A - select length of sign post and cut to length
STEP 2: B - post infill section P1484R (see 4409CC) is cut to length after calculating length required to close off post, and insert into post
STEP 3: C - make up Sign One frame into sign size required (see 4409EE) and insert into post.
STEP 4: D - projecting signs expose the fixings on end of signs, Your options are D - countersunk screws finished to suit colour of sign frame
D1 - cap off with BiFix caps
D1 - use fixings to end frame on top and bottom of horizontal frame, will in most cases hide fixings. The fixing can then be finished with same colour as frame or capped off.
STEP 5: E - cap off with your choice of our wide range of plain and decorative caps.
STEP 6: F - installation of flag mount and projecting signs should be done after consulting:-

ENGINEERS SPECIFICATIONS: Should be sought to ensure size/suitability of the system by user prior to use.

APPLICATIONS: Directional and finger signs , however other uses are car park signs, wayfinding, nameplate, area identification.