ITEM: MAKING WIRE SUSPENDED DIRECTORY PANELS

DESCRIPTION: Hanging wire suspended signs with 7 stand stainless steel wire to form a "U" for easy leveling.

CONSTRUCTION: Also see 4409EE for assembly guide

SPECIFICATION:
STEP 1: A – Cut frame to required length and mitre corners to 45o
STEP 2: B – Using the Vee groove in the back of the frame as centre, drill hole to align with screw flute and using a metal thread fixing screw assemble one end.
STEP 3: B – Repeat for other end.
STEP 4: C – Drill suitable diameter holes, about 50mm ( 2") – 75mm ( 3") in from the edge (or to suit your sign) and thread wire through both holes.
STEP 5: D – Allow suitable hanging length "X" on both sides of wire, cut to length and swage two (2) swage fittings to end of wire.
STEP 6: E – Glue sign faces to both sides of frame (see 4409EE and 4409RRR)
STEP 7: Install suitable fixing to ceiling in position
STEP 8: Once both wires are hanging in place on ceiling fixing, its very easy to level the sign as the "U" shape wire will slide through.

APPLICATIONS: Internal wayfinding in hallways, building etc Point of Sale aisle destination, directories.